· · · Institutional Repository



Home · About · Disclaimer · Terms of use ·
   Options
 
Faculty:
Department:
Type:
Year:

Bay of Fundy: Tidal powr project

Author: Tavenier, M.
Mentor: Agema, J.F. · Glerum, A. · Vos, C.J. · Stuip, J. · Verspuy, C. · Küppers, J.A.G.
Faculty:Civil Engineering and Geosciences
Department:Hydraulic Engineering
Type:Master thesis
Date:1985-09-01
Keywords: getijverschillen · waterstanden · Bay of Fundy · hydropower · turbine · powerplant
Rights: (c) 1985 Tavenier, M.

In the first fase of this study, attention is paid to the cross section of the dam for a plant in Cumberland Basin, capacity 1085 MW. Chosen is for generation over the ebb with use of bulb turbines. The main subject of this study was the design of the turbine caisson. The main subjects are Design principles, Dimensions, Loading and Foundation.

The subvolume is about the enormous tidal difference (in dutch).

Content Viewer