Print Email Facebook Twitter Luanika waterway Title Luanika waterway Author Verhagen, H.J. Date 1978-07-01 Abstract During the dry season shipping between Mongu and Kalabo is impossible, therefore this project was started to improve the situation by dredging. Dredging was started at Mongu harbour, where a new dredger was delivered, assembled and launched. Due to the urgency of the project dredging had to be started before a profound survey concerning the topography and hydrography of the total area was made. This is one of the reasons why it was not possible to make a detailed time and production planning. This report is based on a field survey, carried out from May 29th until June 29th, 1978. The survey can be divided into two parts, first the topographical survey, reSUlting in a 1:20,000 map of the Luanika-Waterway, and second the hydrographic and morphological survey. The purpose of the surveys was to give an advice for the planning of the dredging works in the Luanika-Waterway. Subject ZambeziZambiariver morphology Classification TKJ400500 To reference this document use: http://resolver.tudelft.nl/uuid:099b4d79-e895-40b4-b582-74fe8338a2da Publisher Hydronamic Source Hydronamic (In Demas framework) Republic of Zambia, Ministry of water and natural resources Part of collection Hydraulic Engineering Reports Document type report Rights © 1978 Hydronamic Files PDF luanika1978.pdf 2.9 MB PDF LuanikaA.pdf 2.12 MB PDF LuanikaB.pdf 1.67 MB Close viewer /islandora/object/uuid:099b4d79-e895-40b4-b582-74fe8338a2da/datastream/OBJ2/view