Searched for: +
(1 - 1 of 1)
document
van Dalen, J.H. (author), Servais, R. (author), Boone, D.C. (author)
The A2 tunnel in Maastricht has been built within a dry building pit with a maximum depth of 22 meters with sheet pile walls, suspended in a cement bentonite trench supported by struts at 2 to 4 levels. Dewatering is done by deepwells. The excavation reaches into Limestone layers so the maximum mobilized passive resistance of the sheet pile wall...
conference paper 2015