Searched for: +
(1 - 7 of 7)
document
Wu, Yue (author), Liu, Xiuming (author), Li, Q. (author), Chen, Boxuan (author), Luo, Peng (author), Pronk, Arno (author), Mergny, Elke (author)
By using inflatable moulds and then spraying cellulose-water mixture, one ice dome and two ice towers were built in Harbin in December 2016. During the whole process, form-finding of the inflatable moulds as well as the construction of these ice composite shell structures are very important for the final results.<br/>The mould for the ice dome...
conference paper 2017
document
Minchin, E. (author), Li, X.X. (author)
The traditional system of design-bid-build has long been the principal delivery system for horizontal construction; it has been employed by all the transportation departments in the United States for almost a century. The shift toward design-build (DB) as a time saving method has been successful in many ways, but use of the system has exposed...
conference paper 2011
document
Li, L.-L. (author)
journal article 2011
document
Li, J.-H. (author)
journal article 2005
document
Li, Jun (author)
journal article 1998
document
Li, Jun (author)
report 1998
document
Li, Jun (author)
journal article 1997
Searched for: +
(1 - 7 of 7)