Searched for: +
(1 - 2 of 2)
document
Minchin, E. (author), Li, X.X. (author)
The traditional system of design-bid-build has long been the principal delivery system for horizontal construction; it has been employed by all the transportation departments in the United States for almost a century. The shift toward design-build (DB) as a time saving method has been successful in many ways, but use of the system has exposed...
conference paper 2011
document
Minasowicz, A. (author), Kostrzewa, B. (author)
The analysis proposed is aimed at a detailed risk review for a given project at the stage of value engineering of the integrated value and risk management. On the basis of the cost estimate and the time schedule established, for individual groups of works, the cost or time deviations for each task are specified. Expert knowledge is used for this...
conference paper 2011