Searched for: +
(1 - 20 of 376)

Pages

document
Evers, Patrick L. (author)
master thesis 1998
document
Akkerman, S.D. (author)
master thesis 2009
document
Smit, M. (author)
master thesis 1985
document
Muilwijk, C.P. (author)
master thesis 2003
document
Riemsdijk van Eldik, J. (author)
master thesis 1982
document
de Vries, T. (author)
master thesis 2014
document
Castillo, S.F. (author)
master thesis 1996
document
van Eck, P. (author)
master thesis 1981
document
van Diemen, H. (author)
master thesis 1993
document
Blankestijn, E.P. (author)
master thesis 1974
document
de Vries, Igor T. (author)
master thesis 2009
document
Lestraden, M. (author)
master thesis 2014
document
Mol, M.A.P. (author)
master thesis 1987
document
Boeters, R. (author)
master thesis 1984
document
Runge, Kevin (author)
master thesis 2010
document
de Vries, J.G. (author)
master thesis 1972
document
Nieuwenhuis, M.T.A. (author)
During gas production offshore, also water is produced. There are gas numbers available per well, but the water production is only known for several wells together. This thesis tries to model the water production per well based on the available data. This is done through a least-squares method. The report shows that it is very difficult to find...
master thesis 2014
document
Hermans, M.A. (author)
master thesis 1990
document
Buijsrogge, Th.A. (author)
master thesis 1988
document
Oude Ophuis, R.B.A. (author)
Offshore barge mooring is considered a critical operation. The vessels need to be in close proximity, but may under no circumstance collide. Mooring lines and fenders are installed to keep the vessels in place. Experience has shown that lines tend to break occasionally; one of the reasons for this can be the interaction effect of the two vessels...
master thesis 2016
Searched for: +
(1 - 20 of 376)

Pages