- document
- Evers, Patrick L. (author) master thesis 1998
- document
- Akkerman, S.D. (author) master thesis 2009
- document
- Smit, M. (author) master thesis 1985
- document
- Muilwijk, C.P. (author) master thesis 2003
- document
- Riemsdijk van Eldik, J. (author) master thesis 1982
- document
- de Vries, T. (author) master thesis 2014
- document
- Castillo, S.F. (author) master thesis 1996
- document
- van Eck, P. (author) master thesis 1981
- document
- van Diemen, H. (author) master thesis 1993
- document
- Blankestijn, E.P. (author) master thesis 1974
- document
- de Vries, Igor T. (author) master thesis 2009
- document
- Lestraden, M. (author) master thesis 2014
- document
- Mol, M.A.P. (author) master thesis 1987
- document
- Boeters, R. (author) master thesis 1984
- document
- Runge, Kevin (author) master thesis 2010
- document
- de Vries, J.G. (author) master thesis 1972
- document
-
Nieuwenhuis, M.T.A. (author)During gas production offshore, also water is produced. There are gas numbers available per well, but the water production is only known for several wells together. This thesis tries to model the water production per well based on the available data. This is done through a least-squares method. The report shows that it is very difficult to find...master thesis 2014
- document
- Hermans, M.A. (author) master thesis 1990
- document
- Buijsrogge, Th.A. (author) master thesis 1988
- document
-
Oude Ophuis, R.B.A. (author)Offshore barge mooring is considered a critical operation. The vessels need to be in close proximity, but may under no circumstance collide. Mooring lines and fenders are installed to keep the vessels in place. Experience has shown that lines tend to break occasionally; one of the reasons for this can be the interaction effect of the two vessels...master thesis 2016