Search results
-
Ship Maintenance project Phases II and III Volume 1 Program summary and rational basis for corrosion limits on tankers
-
Maintenance of marine structures: A state of the art summary
-
Ship Maintenance project Phases II and III Volume 2 Study of fatigue of proposed critical structural details in double hull tankers
-
Ship structural integrity information system Phase II, Schulte-Strathaus, M.J. 1996
-
Ship structural integrity information system, Schulte-Strathaus, R. 1995
-
Ship structural integrity information system (SSIS) Phase III: Ship quality information system, Reeve, H.P. 1998
-
Ship Maintenance project Phases II and III Volume 3 Repair management system for critical structural details in ships
-
The role of human error in design, construction, and reliability of marine structures
-
Ship Maintenance project Phases II and III Volume 5 Fitness for purpose evaluation of critical structural details in Tankers
-
Ship Maintenance project Volume 1: Fatigue Damage Evaluation, Bea, R.G. 1995
-
Marine structural integrity programs MSIP
-
Ship Maintenance project Volume 2: Corrosion Damage Evaluations
-
Ship Maintenance project Phases II and III Volume 4 fatigue classification of critical structural details in tankers, Bea, R.G. 1997