Lantsoght, E.O.L. (author), van der Veen, C. (author), De Boer, Ane (author), van der Ham, Herbert (author)In 1997, the Second Stichtse Bridge was built in the Netherlands using the balanced cantilever method. The use of high-strength concrete was proposed. At that time, the long-term behaviour of this material was not known, and no code provisions were applicable. Therefore, it was proposed to monitor the material behaviour and the deflections of...journal article 2018
- document
-
Ensink, S.W.H. (author), van der Veen, C. (author), Hordijk, D.A. (author), Lantsoght, E.O.L. (author), van der Ham, Herbert (author), de Boer, A. (author)In the Netherlands, approximately 150 prestressed T-beam bridges with cast-in-between decks and mainly built in the sixties are still in service. Upon assessment, the prestressed beams often do not fulfil the design codes requirements, whereas upon inspection, they show no signs of distress. For the assessment, additional load transfer...conference paper 2018