Searched for: contributor%3A%22Antonakas%2C+P.+%28mentor%29%22
(1 - 1 of 1)
document
Huisman, M. (author)
The Smit sawing wire system was used in the salvage operation of the Baltic Ace. The sawing wire was drilled underneath the wreck and connected to two barges on opposite sides. Winches were placed on the barges to make a controlled cut through the wreck by pulling the sawing wire back and forth. The cut was made in an upward direction. While the...
master thesis 2016