Searched for: contributor:"Hombergen, Leon (mentor)"
(1 - 8 of 8)
document
van Veenen, Anna (author)
The last couple of years the concept of the Circular Economy (CE) has been gaining more and more attention. The Netherlands want to become a CE as well and the government presented a national policy programme including goals to reach a CE in 2050. One of those goals is that Dutch public authorities should procure all their projects 100%...
master thesis 2018
document
ten Hoeve, Gijs (author)
master thesis 2018
document
Beerens, Tim (author)
The infrastructure gap is defined as the gap between investment requirements of infrastructure and the public funds available. Due to these gaps, not enough new infrastructure is developed and this puts a constraint on economic growth. This study looks at the impact that pension funds can have on closing this infrastructure gap, and thereby aid...
master thesis 2018
document
van Wijck, Dirk (author)
Public construction projects have an image of poor performance, both in the Netherlands and other countries. Too many public projects go over budget and over time. A possible improvement to this poor performance could be Early Contractor Involvement (ECI). ECI literally translates to involving a contractor “early”, which in current practice...
master thesis 2018
document
Lotchouang Kouam, Samuel (author)
Early supplier involvement (ESI) can be defined as a mechanism for involving preferred suppliers in the early phases of product design and development. The concept of ESI is frequently mentioned in the context of New Product Development (NPD) and has been in existence for over half a century with positive results in a number of industries. In...
master thesis 2018
document
Stoel, Marijke (author)
master thesis 2017
document
den Hoedt, Joost (author)
This thesis describes how contractors in the water construction industry can capture and store performance information to present in tenders for Best Value projects. It describes which performances are relevant to present in such tenders, how performance information can be captured during projects and how performance information can be stored...
master thesis 2017
document
Michielsen, Thijs (author)
In the days when traditional RAW1 contracts were still popular for large infrastructural projects, the entire engineering of a new project was made by the clients themselves. After the realization of the design, this design was put on the market and was contracted. Contractors who wish to enroll for this work made a cost calculation on the basis...
master thesis 2017
Searched for: contributor:"Hombergen, Leon (mentor)"
(1 - 8 of 8)