Searched for: contributor%3A%22Hoving%2C+J.S.+%28graduation+committee%29%22
(1 - 19 of 19)
Comparative feasibility study of a 30 MW disruptive floater solution with a 15 MW PivotBuoy and a benchmark 15 MW semi-submersible floater in the Bay of Biscay
Comparative feasibility study of a 30 MW disruptive floater solution with a 15 MW PivotBuoy and a benchmark 15 MW semi-submersible floater in the Bay of Biscay
Design and Analysis of an Underwater Wedge Connection
Design and Analysis of an Underwater Wedge Connection
Helical Piles as Complementary Foundation for Offshore Temporary Structures
Helical Piles as Complementary Foundation for Offshore Temporary Structures: A study into the effects of incorporating helical piles into monopile installation templates
Wave Induced Dynamics of Offshore Heavy Lift Cranes on Jack-Ups
Wave Induced Dynamics of Offshore Heavy Lift Cranes on Jack-Ups: Analysis of the annual probability of failure of the crane in normal operation
Optimization of grillage design for the transportation oof suction caisson jackets
Optimization of grillage design for the transportation oof suction caisson jackets
Design of Prognosis model for transportation volumes related to construction methods
Design of Prognosis model for transportation volumes related to construction methods
The implementation of Arctic ice management
The implementation of Arctic ice management: Counteracting the annual Arctic sea ice loss by distributing sea water on top of sea ice
Wind-Induced Dynamic Response of High-Rise Buildings
Wind-Induced Dynamic Response of High-Rise Buildings: The Effects of Soil-Structure Interaction and a Comparison with the Eurocode Approach
Integrating Sustainable Objectives in Transmission System Operators' Projects
Integrating Sustainable Objectives in Transmission System Operators' Projects: A decision-support framework for the prioritisation and integration of sustainable objectives in projects
A supply chain model for the BLUE-STAR Tension Leg Platform
A supply chain model for the BLUE-STAR Tension Leg Platform
Project Strategy Generation and Visualization Assistant for Schedule Delays
Project Strategy Generation and Visualization Assistant for Schedule Delays: Integrating Evolutionary Algorithm in Lean + BIM Approaches
Optimizing Construction Knowledge Integration in Offshore Wind Projects
Optimizing Construction Knowledge Integration in Offshore Wind Projects
Evaluation of Ice loads on Beitstadsundet bridge by deterministic and probabilistic approaches
Evaluation of Ice loads on Beitstadsundet bridge by deterministic and probabilistic approaches
A new criticality analysis approach for infrastructure components
A new criticality analysis approach for infrastructure components: New FMECA approach for Infrastructure asset management
Incorporating the nonlocality of a nonlinear continuum in an effective 1D model for monopile foundations
Incorporating the nonlocality of a nonlinear continuum in an effective 1D model for monopile foundations
A feasibility study for the installation of 10 MW offshore wind turbines with an SSCV
A feasibility study for the installation of 10 MW offshore wind turbines with an SSCV
The Bubble Barrier
The Bubble Barrier
Surge and swab pressure
Surge and swab pressure: A transient approach to running expandable assemblies
The additional value of a sonic drill in a new compaction method
The additional value of a sonic drill in a new compaction method: An experimental approach
Searched for: contributor%3A%22Hoving%2C+J.S.+%28graduation+committee%29%22
(1 - 19 of 19)