Searched for: contributor%3A%22Peperkamp%2C+W.+%28mentor%29%22
(1 - 4 of 4)
document
Gatta, P. (author)
Ventspil Free Port Authority has commissioned the design of a new berth capable of hosting post Panamax vessels and having a retaining height of 18.5 m. In proximity of the quay wall two sewage pipes lay on the bottom of the Venta River’s bed, which need to be combined into one single conduit with a diameter of 900 mm. In proximity of the quay...
master thesis 2011
document
Mooyaart, L.F. (author)
In the Netherlands 6,8% of the total electricity production came from renewable energy sources. Electricity was 17 % of the total energy consumption in that year. In total 1,2% of the energy consumption was therefore renewable. The objective of the cabinet to get 20% of the energy from renewable energy sources will therefore be a major challenge...
master thesis 2009
document
Bhagwandas, A. (author)
In de praktijk worden steeds meer gebouwen vervaardigd uit geprefabriceerde betonelementen. Deze elementen worden in de fabriek gemaakt waarna ze worden getransporteerd naar de bouwplaats. Op de bouwplaats worden deze onderdelen aan elkaar bevestigd. Deze werkwijze bespaart tijd in de uitvoeringsfase ten opzichte van traditionele betonbouw ...
master thesis 2007
document
Pieterse, E.A. (author)
Prefabricage van beton is op de Nederlandse bouwmarkt sinds de tweede wereld oorlog een standaard fenomeen geworden. Door Stufib studiecel 6 is in oktober 2004 vastgesteld dat een stapeling van gevelelementen waarbij de verticale voegen over de hoogte van het gebouw verspringen vanuit constructief oogpunt een goed alternatief is voor...
master thesis 2006
Searched for: contributor%3A%22Peperkamp%2C+W.+%28mentor%29%22
(1 - 4 of 4)