Searched for: contributor%3A%22Verheij%2C+H.J.+%28mentor%29%22
(1 - 1 of 1)
document
IJsebaert, T. (author)
During the execution of reclamation projects by Boskalis, often a temporary work channel and basin are required. This work channel is used by the dredging equipment to reach the project site as close as possible. The project site is often located in very shallow water which makes a channel necessary. The basin is used to transport the dredged...
master thesis 2010