document
Bakker, K.J. (author), Bezuijen, A. (author)
Ten years have passed since in 1997 for the first time construction of bored tunnels in the Netherlands soft soil was undertaken. Before that date essentially only immersed tunnels and cut-and-cover tunnels were constructed in the Netherlands. The first two bored tunnels were Pilot Projects, the 2nd Heinenoord tunnel and the Botlek Rail tunnel....
conference paper 2008
document
Bakker, K.J. (author), Bezuijen, A. (author)
In 1997 for the first time construction of bored tunnels in the Netherlands soft soil was undertaken. Before that date essentially only immersed tunnels and cut-and-cover tunnels were constructed in the Netherlands. The first two bored tunnels were Pilot Projects, the 2nd Heinenoord tunnel and the Botlek Rail tunnel. Since then a series of other...
conference paper 2008