Searched for: department%3A%22Structural%255C%2BEngineering%22
(81 - 100 of 1,798)
- Developing a Project Alliance Suitability Scan for Dutch Infrastructure Projects: Based on experiences from The Netherlands and Australia
- Optimisation model for scheduling preventive tamping maintenance: A study into the effect of using the alignment in combination with the level to schedule preventive tamping maintenance
- The discussion on the level of detail: Developing a framework to detect the difficulties in the determination of the level of detail in integrated contracts of large infrastructure projects
- The influence of a residual stress distribution on the fatigue crack growth rate of bead-on-plate welded steel specimens
- Towards BIM for Asset Management in Dutch road infrastructure projects: A study of the perspectives of the client and contractor for the municipality of Rotterdam/Netherlands
- How can Early Warning Signs contribute to the predictability of potential cost overruns in public infrastructure road works under integrated contracts, so that costs can be reduced for the contractor?
- Impact Assessment Model for Multi-Layer Safety: Development and application of a method to assess interacting interventions that reduce the damage of storm surges at container terminals
- Indoor training and thermal comfort: Improving thermal comfort of human subjects training indoors by a configuration of parameters, specifically airflows
Searched for: department%3A%22Structural%255C%2BEngineering%22
(81 - 100 of 1,798)