- document
-
Shafieefar, Mehdi (author), Shekari, Mohammad Reza (author), Hofland, Bas (author)Reshaping berm breakwaters have been mainly designed and built for water depth less than 20 m. In such conditions, a toe structure may be needed to reduce bottom settlements and increase geotechnical stability in the loose subsoil condition. Also, a toe berm can be deployed to reduce the berm recession and increase the stability of the...journal article 2020