- document
-
Kemerink, Renk (author)Construction resource management in the Netherlands is causing environmental concerns due to a high demand for infrastructure maintenance and carbon/nitrogen emissions. Insufficient optimization of resource management between projects results in more traffic and higher energy demand, but measures such as linking projects, program management, and...master thesis 2023
- document
-
Charisi, Penny (author)The current research stems from the motivation of controlling the phenomenon of traffic congestion in urban areas that can be deteriorated due to the implementation of a construction project. Nowadays, it is frequently observed that construction activities in complex urban environments appear undesirable effects on the communities surrounding...master thesis 2023
- document
-
le Blanc, O.L.R. (author)The world is facing climate change which has sever impacts on extreme weather events, biodiversity and rising seas. Greenhouse gas emissions need to be reduced to counteract climate change. One specific way to contribute to that reduction is setting Zero-Emission (ZE) zones to ban fossil fuel vehicles in urban areas which will presumably lead to...master thesis 2020
- document
- Tesselaar, Tom (author) master thesis 2020
- document
- Dijkstra, Jan Tjerk (author) master thesis 2018
- document
-
Hoekstra, Eke (author)Nowadays, a worldwide urbanisation trend can be observed. In the Netherlands, it is expected that the population of the four largest cities will be increased with an average of 15% in 2030. In total, these four big cities will accommodate a third of the Dutch population in 2030 (Centraal Bureau voor de Statistiek & Planbureau voor de...master thesis 2018
- document
-
Oosterwijk, Lisa (author)Currently the on-site logistics of construction projects are very inefficient. The construction industry is very fragmented and there are a lot of different information and material processes, therefore it is difficult for a main contractor to get control of these all. It is assumed that if the main contractor gets control of the logistics, the...master thesis 2017