Searched for: subject%3A%22Monte%255C%252BCarlo%255C%252Bsimulation%22
(1 - 3 of 3)
document
Yuan, Yiping (author), Liu, Zhou (author), Chen, Zhe (author), Hoej Jensen, Kim (author), Popov, M. (author)
With the increasing penetration of converter-interfaced generators, the frequency containment reserve (FCR) from conventional generators keeps going down, leading to a potential risk of frequency instability under contingencies. Consequently, Converter-interfaced generators are required to provide FCR and participate in the corrective...
journal article 2023
document
Ma, H. (author), Psychas, D.V. (author), Xing, Xuhuang (author), Zhao, Qile (author), Verhagen, S. (author), Liu, Xianglin (author)
The tropospheric delay is one of many error sources that affect the Global Navigation Satellite System (GNSS) positioning solutions. The widely used troposphere models assume a homogeneous atmosphere so that only the zenith delay needs to be determined and is mapped through an elevation-dependent mapping function. This procedure is to reduce...
journal article 2021
document
Liu, Huimin (author), Jiang, Canhui (author), Liu, Y. (author), Hertogh, M.J.C.M. (author), Lyu, Xue (author)
The high uncertainty of megaproject results in increasing complexity in the decisionmaking and ultimately leads to different degrees of cost overrun and project delays. One of the critical reasons for cost overrun and delay is the optimism bias of decision makers. Although the previous literature has analyzed the cost overrun distribution of...
journal article 2018