- document
-
van der Beek, T. (author), Souravlias, D. (author), van Essen, J.T. (author), Pruyn, J.F.J. (author), Aardal, K.I. (author)The resource constrained project scheduling problem with a flexible project structure and consumption and production of resources, involves making a selection of activities and scheduling these activities in order to minimize the makespan, subject to precedence and resource constraints. Since finding a feasible selection of activities is NP...journal article 2023
- document
-
van Teeffelen, Jop (author)The demand for online shopping has grown tremendously in the last couple of years. Picnic, a major player in the online grocery industry, is struggling to achieve long-term growth within its current operations. Scheduling and planning are key drivers for maintaining operational efficiency. The Fulfilment Centre (FC) and...master thesis 2022
- document
-
Pleunes, Jelle (author)In this paper, a variant of the resource-constrained project scheduling problem is discussed. This variant introduces time-dependence for resource capacities and requests, making the problem a more realistic model for many practical applications such as production scheduling and medical research project planning. The main aim of this paper is to...bachelor thesis 2022
- document
-
Vermeulen, Jasper (author)Scheduling has been subject to much research. The resource-constrained project scheduling problem (RCPSP) is no exception. With the multiple different variations and additions to the standard definition that are possible, many exact, heuristic and meta-heuristic approaches have been proposed. One of those variations is allowing tasks in the...bachelor thesis 2022
- document
-
Prins, Nina (author)Purpose - This development project is focused on the combination of project scheduling and risk mitigation for large infrastructure projects. The aim of this project is to develop a model that can automatically restructure the network schedule to enable that delay is mitigated as much as possible while the effects on multiple project criteria...master thesis 2022
- document
-
Kammouh, O. (author), Kok, M.W.A. (author), Nogal Macho, M. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)Changes in a construction project schedule can impact the project's planned duration, resulting in penalties. A manual trial-and-error probabilistic approach is usually conducted to find an appropriate set of corrective measures to mitigate delays of the overall project. However, this approach does not capture the actual goal-oriented...journal article 2022
- document
-
van Leeuwen, Anouk (author)The Dutch Railways (NS) is the Dutch national passenger railway operator. They own rolling stock that has to be maintained regularly. One of the maintenance facilities executing regular maintenance on regional trains is the maintenance department (OB) in Leidschendam. The aim of this project is to develop a framework for optimizing the...master thesis 2021
- document
-
Kammouh, O. (author), Nogal Macho, M. (author), Binnekamp, R. (author), Wolfert, A.R.M. (author)Probabilistic Monte Carlo simulations are often used to determine a project's completion time given a required probability level. During project execution, schedule changes negatively affect the probability of meeting the project's completion time. A manual trial and error approach is then conducted to find a set of mitigation measures to...journal article 2021
- document
-
Peschier, Daan (author)Aircraft base maintenance consists of hundreds of tasks including preventive, corrective and modification tasks which have to be scheduled to a few check moments per year. The allocation of tasks to checks represents a complex scheduling problem due to the constraints involved. A mixed integer linear programming model was developed to optimize...master thesis 2019
- document
-
Verburg, Floris (author)For performing technical maintenance, it is important to keep a detailed schedule of resources and temporal constraints. The Resource Constrained Project Scheduling Problem (RCPSP) is a well de- fined scheduling model with both resources and temporal constraints. Precedence Constraint Posting (PCP) is a technique to solve the NP-hard RCPSP...master thesis 2018
- document
-
Mountakis, Kiriakos Simon (author)The research presented in this thesis is part of the Rolling Stock Life Cycle Logistics applied research and development program, conducted by NedTrain. As a company, NedTrain belongs to Nederlandse Spoorwegen (NS; the principal railway company in the Netherlands) and provides maintenance services for the NS train-fleet. The aim of this program...doctoral thesis 2018
- document
-
Wilmer, D. (author)Robustness is essential for schedules if they are being executed under uncertain conditions. In this thesis we research robustness in Partial Order Schedules, which represent sets of solutions for instances of the Resource-Constrained Project Scheduling Problem. They can be generated using a greedy procedure called Chaining, which can be easily...master thesis 2015
- document
-
Staats, J.J. (author)In this work we improve on existing scheduling techniques suitable for scheduling problems at the train maintenance provider, NedTrain. Scheduling problems that require flexible solutions can be modeled using variations of the Resource Constraint Project Scheduling Problem (RCPSP), which can be solved using Precedence Constraint Posting (PCP)....master thesis 2014
- document
-
De Nijs, F. (author)Many meta-heuristic approaches have been suggested for or applied to the Resource Constrained Project Scheduling Problem (RCPSP). The existence of a number of highly accessible standard benchmark sets has promoted a research focus on finding anything that improves average solution quality, without investigating what effect is responsible for the...master thesis 2013
- document
-
Mountakis, K.S. (author)We study the application of stochastic scheduling methods for dealing with the negative impact of uncertainty on the timely delivery of NedTrain maintenance projects. A stochastic scheduling problem includes a quantification of uncertainty by representing the duration of a maintenance activity with a probability distribution. The solution is no...master thesis 2013