- document
-
Boelens, Niels (author)The goal of this research is to create a design for a method to enable the generation and implementation of evidence-based throughput times in the planning process of the construction industry. The current planning process and the generation and collection of throughput times relies heavily on experience-based information. Generating throughput...master thesis 2022
- document
-
Albers, M.J. (author)This thesis proposes a solution, consisted of 12 partial solutions, to implement in the workshop of Pon Power in a way that better suits the current system.master thesis 2015