Searched for: subject%3A%22Uncertainty%255C+modeling%22
(1 - 11 of 11)
document
Kapnisis, Theodoulos (author)
Hydrofoil crafts with fully submerged foils can provide fast and economical waterway transport. However, their operation requires reliable onboard control systems to ensure the safety and comfort of their passengers, especially in rough sea conditions. This thesis project is focused on the dynamical modelling and the design...
master thesis 2022
document
Francken, Arjan (author)
master thesis 2022
document
Graas, Rik (author)
Several initiatives are being developed to shift the current paradigm in Air Traffic Management (ATM) from the tactical-based approach to more strategic-based coordination of flights. This transformation of the ATM system relies on the improvement of predictive models that predict the 4D-trajectory of an aircraft. Previous studies primarily...
master thesis 2021
document
Zwaginga, J.J. (author), Stroo, Ko (author), Kana, A.A. (author)
To decrease Europe's harmful emissions, the European Union aims to substantially increase its offshore wind energy capacity. To further develop offshore wind energy, investment in ever-larger construction vessels is necessary. However, this market is characterised by seemingly unpredictable growth of market demand, turbine capacity and...
journal article 2021
document
Zwaginga, Jesper (author)
To decrease Europe’s harmful emissions, the European Union aims to substantially increase its offshore wind energy capacity. To further develop offshore wind energy, investment in ever-larger construction vessels is necessary. Designing these vessels is difficult however, as this market is characterised by a large but seemingly unpredictable...
master thesis 2020
document
Abrishami, S. (author), Khakzad, N. (author), Hosseini, Seyed Mahmoud (author), van Gelder, P.H.A.J.M. (author)
Success Likelihood Index Model (SLIM) is one of the widely-used deterministic techniques in human reliability assessment especially when data is insufficient. However, this method suffers from epistemic uncertainty as it extremely relies on expert judgment for determining the model parameters such as the rates and weights of the performance...
journal article 2020
document
Chen, C. (author), Khakzad, Nima (author), Reniers, G.L.L.M.E. (author)
Vapor cloud explosion (VCE) accidents in recent years such as the Buncefield accident in 2005 indicate that VCEs in process plants may lead to unpredicted overpressures, resulting in catastrophic disasters. Although a lot of attempts have been done to assess VCEs in process plants, little attention has been paid to the spatial-temporal...
journal article 2020
document
Calvert, S.C. (author), Taale, Henk (author), Snelder, M. (author), Hoogendoorn, S.P. (author)
In a bid to cost-effectively tackle congestion, traffic management is often seen as a key option to utilise road capacity. Prior to the application of traffic management measures, a-priori analysis allows the effectiveness of measures to be judged and where necessary adapted. However, current approaches do this without considering the effects...
journal article 2018
document
Melese, Y.G. (author), Heijnen, P.W. (author), Stikkelman, R.M. (author), Herder, P.M. (author)
Energy and industrial networks such as pipeline-based carbon capture and storage infrastructures and (bio)gas infrastructures are designed and developed in the presence of major uncertainties. Conventional design methods are based on deterministic forecasts of most likely scenarios and produce networks that are optimal under those scenarios....
journal article 2016
document
Kayastha, N. (author)
Due to the complexity of hydrological systems a single model may be unable to capture the full range of a catchment response and accurately predict the streamflows. The multi modelling approach opens up possibilities for handling such difficulties and allows improve the predictive capability of models. One of multi modelling approaches called ...
doctoral thesis 2014
document
Vrouwenvelder, A.C.W.M. (author)
According to ISO 2394, structures shall be designed, constructed and maintained in such a way that they are suited for their use during the design working life in an economic way. To fulfil this requirement one needs insight into the risk and reliability under expected and non-expected actions. A key role in this respect is played by the...
conference paper 2013
Searched for: subject%3A%22Uncertainty%255C+modeling%22
(1 - 11 of 11)