document
de Jong, Han (author)
Constructing a dam across a tidal basin has alway been a long-term integral solution to many water related problems of the surrounding area such as flooding, river control and fresh water storage. However, immense challenges are accompanied with the closure works of large basins. This research treats the closure strategy to close the Gulf of...
master thesis 2018
document
Verhagen, H.J. (author)
For this book we have deliberately chosen that the text should follow a more or less logical design procedure for closure dams. It is emphasized that only the construction aspect of stopping the water movement is considered in this book. This means that only the closing operation itself is treated; the transformation of the closing dam into a...
lecture notes 2016
document
Voorendt, M.Z. (author), Molenaar, W.F. (author), Bezuyen, K.G. (author)
Lecture notes CT3330. Introduction, history of caissons, construction of standard caisson, design of standard caisson, construction of pneumatic caissons.
lecture notes 2011
document
Verhagen, H.J. (author)
This chapter discusses the design aspects of estuary and river closures and those of reservoir dams and certain other hydraulic structures. The focus of this chapter is on closures, not on the situation after the closure has been completed.
book chapter 2007
document
Anonymous, A. (author)
HR Wallingford has commenced an engineering review on the Final Closure of Saemangeum Dike. This draft final report represents the completion of the second phase of studies by HR Wallingford and is issued for review by KARICO and discussion with their representatives during meetings planned in Ansan during the second week of October 2005. The...
report 2005
document
Anonymous, A. (author)
HR Wallingford was commissioned by The Rural Research Institute of the Korea Agricultural and Rural Infrastructure Corporation to carry out various studies relating to the final closure of the Saemangeum project offshore dikes currently under construction on the western coastline of South Korea. In addition to the numerical modelling of the...
report 2002
document
Bosma, E. (author)
In Bangladesh a bridge is under construction over the Jamuna River, one of world's largest braiding rivers. The Dhaleswari river system is fed by the Jamuna through smaller rivers, called spill channels, because they only carry discharge during the monsoon. One of the functions of the northern Dhaleswari offtake is the supply of water to the...
master thesis 1996
document
Van Broekhoven, S.H. (author)
Onderzoek gedaan naar aanleiding van het Saemangeum project (Korea). Analyse en physisch modelonderzoek naar de volgende vragen: 1. in hoeverre een deel van het totale verval over het sluitgat wordt afgebouwd boven de bodem verdediging; 2. welke K-waarden moeten worden gebruikt bij de bepaling van de stabiliteit van de stenen op en achter de...
master thesis 1995
document
Van Roode, F.C. (author)
lecture notes 1994
document
Ho Ngoc Phu, N.P. (author), Le Tan Ham, T.H. (author)
Design of an closure dam and ancillary works at the upstream end of the Tam Giang estuary, Hue province. The main purpose of the works is to prevent salt intrusion. Report in English and Vietnamese.
report 1993
document
Jansen, P.L.M. (author), Vreeburg, I.C. (author)
The Gulf of Khambat in India is an estuary with an extremely large tidal range which in average circumstances varies between approximately 4.5 m for a neap-tide and 8.5 m. f or an average spring-tide. This large tidal difference goes hand in hand with a tidal flow in the range of 6 to 11 * 109 m3 per tidal cycle. Due to these features the Gulf...
master thesis 1992
document
Breusers, H.N.C. (author)
The conformity of local scour in experiments with non-cohesive bed material is studied for two-dimensional problems. A description of the flow pattern in the scour hole and development of the scouring process with time is given. The importance of the time scale in the design of structures where a temporary exposure of the bed to scouring effects...
report 1966
document
Wiggerts, H. (author)
De uitvoeringsgegevens waarover men inlichtingen wil hebben moeten gemakkelijk en snel te vinden zijn, en niet alleen geven wat er in het Veersegat gebeurd is maar ook waarom het zo werd gedaan. Behalve de wijze van totstandkoming van de definitieve constructies (hoofdstuk7) zijn daarom in aparte hoofdstukken de "Al.gemene-“ en "Organisatorische...
report 1963
document
Van de Kreeke, J. (author)
Uit de proeven blijkt, binnen de grenzen van de onderzochte toestanden, dat de kritieke gemiddelde snelheid (vkr) kan worden voorgesteld door als een functic van de logarithme van de waterdiepte boven de dam (h dam). De grootste aantasting vindt plaats ter plaatse van de benedenkruinlijn.
report 1963
document
Valken, K.F. (author), Bischoff van Heemskerck, W.C. (author)
Research for the execution of the Deltaworks, focus on the determination of boundary conditions for the new closure works, planning of the deltaworks; caisson closures, dam design.
book chapter 1963
document
Informatiebrochure met detailtekeningen van dijken en gemalen.
report 1955
document
General overview of the works, PR document issued by the ministry for foreign guests and journalists.
report 1930