- document
- Troost, T.A. (author) report 2007
- document
- Reinders, J.E.A. (author), Ham, J.M. (author) report 2003
- document
- Verhagen, F.Th. (author), Vermetten, A. (author) report 2002
- document
- Walstra, D.J.R. (author) report 2001
- document
- Kuiper, C. (author) report 2000
- document
- Kuiper, C. (author) report 2000
- document
- Rijn, L.C. van (author) report 2000
- document
- Rijn, L.C. van (author) report 2000
- document
- Roelvink, J.A. (author), Koningsveld, M. van (author), Ruessink, B.G. (author), Walstra, D.J.R. (author), Aarninkhof, S.G.J. (author) report 2000
- document
- Rijn, L.C. van (author) report 1999
- document
- Ruijgh, E.F.W. (author) report 1999
- document
- Peerbolte, E.B. (author) report 1995
- document
-
Dekker, G.J. (author), van der Wilt, M. (author), van den Bosch, F.J. (author)Cost estimation of software development and control of the cost during the development, are difficult due to the lack of useful cost figures from previous projects, and consequently due to the lack of an accurate cost estimation and management method. This report describes the results of the first phase of a study to develop a software cost...report 1981