HR Wallingford has commenced an engineering review on the Final Closure of Saemangeum Dike. This draft final report represents the completion of the second phase of studies by HR Wallingford and is issued for review by KARICO and discussion with their representatives during meetings planned in Ansan during the second week of October 2005. The...
report 2005
document
Anonymous, A. (author)
HR Wallingford was commissioned by The Rural Research Institute of the Korea Agricultural and Rural Infrastructure Corporation to carry out various studies relating to the final closure of the Saemangeum project offshore dikes currently under construction on the western coastline of South Korea. In addition to the numerical modelling of the...
report 2002
document
Anonymous, N.N. (author)
Maps of the Rhine section between Basel and Mainz including the flood defence system.
report 1994
document
Anonymous, A. (author)
1. INTRODUCTION 1. 1 Project background 1.2 Outline of official arrangements 1.3 Project objectives 2. REsULTS AND CONCLUSIONS 2. 1 Dike design 2. 1.1 Dike-closure methods 2.1.2 Availability of data related to dike design 2.1.3 Current dike design 2. 1.4 Inner dikes 2.1.5 Alternative reclamation possibilities 2.2 Polder development 2.2.1...
report 1994
document
Anonymous, A (author)
The Saemankeum Comprehensive Tideland Reclamation Project has as objective the reclamation of the extensive tidal flats in the estuaries of Dongjin river and Mankyung river for, among others, agricultural, urban and industrial use. The project includes the construction of a number of closure dams with a total length of some 34 km. Due to the...