Searched for: subject%3A%22dike%255C+breach%22
(1 - 20 of 28)

Pages

document
Waarsenburg, F.M. (author), Van Dam, P. (author)
De hiernavolgende notitie geeft een korte samenvatting van literatuur met betrekking tot de dijkdoorbraak van december 1894 in de Nieuw-Strijenpolder op het eiland Tholen. De dijkdoorbraak werd waarschijnlijk veroorzaakt door een zandmeevoerende wel.
report 1980
document
Fujita, Y. (author), Tamura, T. (author), Muramoto, Y. (author)
Vertaling van een origineel Japans rapport naar the Nederlands. Flood damage due to a bank breach increases with a river water inflow through it, which is enlarged by a hydraulic action of the inflow, while the influx rate is controlled by the geometry of the breach as weil as the stage and discharge of the river. For the purpose of predicrion...
report 1984
document
Fujita, Y. (author), Tamura, T. (author), Muramoto, Y. (author)
Vertaling van een origineel Japans rapport naar the Nederlands. Flood damage due to a bank breach increases with a river water inflow through it, which is enlarged by a hydraulic action of the inflow, while the influx rate is controlled by the geometry of the breach as weil as the stage and discharge of the river. For the purpose of predicrion...
report 1984
document
Steetzel, H.J. (author), Visser, P.J. (author)
In het kader van het meerjarig onderzoek naar bresgroei is in dit verslag de vertikale ontwikkeling van een initiële bres beschreven aan de hand van de resultaten van een modelonderzoek.
report 1992
document
Steetzel, H.J. (author)
Het voorliggende onderzoek heeft tot doel inzicht te verschaffen in de wijze waarop het verloop van het instroomdebiet en de binnenwaterstand afhangen van de breedtegroei van de bres. De resultaten van deze verkenning geven aan in hoeverre (of en zoja, met welke middelen) nader onderzoek naar het proces van bresgroei gewenst is en wat de...
report 1993
document
Ten Hove, S. (author)
In de nacht van dinsdag 11 op woensdag 12 augustus 1992 is de westelijke dijk langs het A.G. Wildervanckkanaal tijdens de aanleg van een gasleiding doorgebroken. Daarbij is een groot deel van de aangrenzende Tussenklappenpolder overstroomd en heeft het land een aantal dagen onder water gestaan. Aan de in de polder gelegen akkerbouw, industrie en...
report 1994
document
Bakker, W.T. (author), Van der Graaff, J. (author), Kraak, A. (author), Smit, M.J. (author), Snip, D.W. (author), Steetzel, H.J. (author), Visser, P.J. (author)
In deze rapportage wordt een samenvatting van de achtergronden, de voorbereiding en het verloop van de beide proeven gegeven. Aan de successen die zijn behaald en de lessen die zijn geleerd, wordt aandacht besteed. De proeven vormen een onderdeel van het onderzoek naar dijkdoorbraakprocessen dat in opdracht van de Dienst Weg- en Waterbouwkunde...
report 1996
document
Kernkamp, H.W.J. (author), Jonge, J.J. de (author)
report 1997
document
Vroeg, J.H. de (author)
report 1999
document
Stelling, G.S. (author)
report 1999
document
Lorenz, N. (author), Dhondia, J.F. (author), Kernkamp, H.W.J. (author), Laguzzi, M.M. (author)
report 1999
document
Busnelli, M.M. (author)
In the Netherlands mathematical models have been applied to represent the breach growth in sand dikes (Bres model (Visser 1998) and Breach model (Steetzel and De Vroeg 1998)). They were also applied to clay dikes in order to adapt and extend them. However these models contain empirical parameters and assumptions that restrict their application...
report 1999
document
Duinmeijer, S.P.A. (author)
Nowadays flooding because of a dike breach can be simulated with high accuracy by use of computer models. Delft FLS, which stands for DELFT Flooding System, developed by WL - Delft Hydraulics, is such a model. The hydrodynamic processes occurring during a flooding are complex, for example moving hydraulic jumps and propagating bores. The...
master thesis 2002
document
Häglund, M. (author), Svensson, P. (author)
Many coastal areas in Vietnam suffer from erosion. One of the worst affected areas is the Hai Hau beach, located in the Red River delta in northern Vietnam. Over the last hundred years, vast parts of the beach have eroded at an average rate of approximately 25 m per year. Important agricultural land has vanished into the sea and families have...
report 2002
document
Verheij, H.J. (author)
report 2003
document
Mierlo, M.C.L.M. van. (author)
report 2005
document
Mierlo, M.C.L.M. van. (author)
report 2005
document
Klerk, W.J. (author)
In the Netherlands flood risks are often assessed by using a dike ring approach. This approach has, aside from many advantages, also some disadvantages. The main disadvantage is that, when zooming in on a small area, the effect of the system on that small area and vice versa, is or cannot be accounted for properly. Research has shown that for a...
master thesis 2013
document
Klerk, W.J. (author), Kok, M. (author), de Bruijn, K.M. (author), Jonkman, S.N. (author), van Overloop, P.J. (author)
In the Netherlands, flood risk analysis is usually carried out for a location, without considering potential flood defence failures in upstream areas. This may result in significant over- or underestimation of flood risks. The effect of upstream failures on failure probabilities and flood risks in other areas is called load interdependence of...
conference paper 2014
document
Albers, T.S. (author)
Floods cause, even in modern countries, a lot of victims and damage every year. Generally, countries invest in prevention and protection, yet, also emergency response measures could be a (last) option. Regarding the latter, a distinction is made between preventive emergency measures (e.g. sand bags to raise the crest level of a flood defence)...
master thesis 2014
Searched for: subject%3A%22dike%255C+breach%22
(1 - 20 of 28)

Pages