- document
-
Dach, Florian (author)The amount of floating offshore wind farms under development has drastically increased over the past years as the technology becomes viable for pre-commercial and commercial scale projects. Projects of this size require a streamlined, efficient production of the complete floating offshore wind turbine (FOWT), not only for manufacturing the...master thesis 2023
- document
-
Eijkman, M. (author)By 2030, a new amphibious transport ship is to be available for the Dutch Royal Navy. In light of the foreseen rise in airborne operations from the ship, more insight is desired into the impact of ship design choices on helicopter operational availability. There is need for a predictive tool, which can be used in the early design phase of the...master thesis 2021
- document
-
Khuntia, S.R. (author), Rueda, José L. (author), van der Meijden, M.A.M.M. (author)Location of wind power plants and demand centres are not always close by; hence, the transmission of energy puts a burden on existing grid infrastructure. This unwanted burden necessitates transmission lines to operate more and more frequently close to their operating limits. To alleviate such situations, this research addresses the advantages...journal article 2019
- document
-
Metz, Bob (author)<br/>Vessel motion limits to guarantee operable pipe integrity<br/>Subsea pipelines are extensively used to transport oil and gas from offshore facilities to offshore terminals, pump stations or to the coast. As the installation of pipelines makes up a significant percentage of the total costs of a project, the workability of the installation...master thesis 2018
- document
-
Bruijn, Willem (author)A complex marine project consist of series of operations, with each operation subject to a predefined operational limit and duration, depending on the equipment being used. If actual weather conditions exceed the operational limit, then the operation cannot be executed and hence downtime occurs. It is up to contractors, such as Boskalis, to...master thesis 2017
- document
-
Rip, J. (author)A marine operations encounters downtime if its operational limit is exceeded during project execution. Accurate information about the expected downtime during a marine project is important information in the tender phase of such a project. The purpose of this thesis is therefore to give insight in the available methods for downtime analysis in...master thesis 2015
- document
-
Van Aubel, J.F. (author)When harsh weather conditions are expected during an offshore pipeline operation, the decision to start the abandonment procedure has to be taken based on pipeline integrity limits. The pipeline integrity which is analysed by a maximum design sea state does not correspond to the situation offshore, because sea states always occur in a different...master thesis 2015