Searched for: subject%3A%22process%22
(1 - 3 of 3)
document
Marchand, M. (author)
The aim of this report is to document the output of the three workshops and the questionnaire. The results of the Flood risk analysis has been reported in another Floodsite report: De Bruijn et al., 2008. For a complete description of the Schelde pilot study reference is made to Chapter 8 of the FLOODsite book on pilot sites (Schanze, in prep.).
report 2009
document
Schanze, J. (author)
The report aims at describing the results of testing a methodology for composing, analysing and evaluating long-term futures of flood risk systems mainly considering scenarios of autonomous change as well as strategic alternatives for targeted flood risk reduction.
report 2009
document
McGahey, C. (author)
This report is Deliverable 18-2 which describes the conceptual, methodological and technological frameworks and how these are implemented for three pilot sites - the Thames, Schelde and Elbe - through prototype decision or ‘discussion’ support tools. The report describes the generic interactions between all relevant factors that drive and...
report 2009