Searched for: subject%3A%22project%255C+planning%22
(1 - 9 of 9)
document
van Bouwelen, Björn (author)
There is a never-ending quest to search for better ways of planning and controlling projects. Currently the majority of all projects are planned with the critical path method and controlled using earned value management. This way of planning and controlling projects has been used for decades now and can be seen as traditional project management ...
master thesis 2017
document
Ceelen, S.B.L.T. (author)
This paper suggests a novel perspective on project management and it’s value. Project management is widely accepted as a relevant perspecti’ve on the development of large engineering projects. Over time it proved its value and through incremental improvement has developed further. Although often applied for the development of projects project...
master thesis 2015
document
Guha, Soumik (author)
Projects in the Complex Engineer-to-order (ETO) sector are subjected to frequent schedule delays caused by engineering changes, supply chain delays and fabrication delays. Project organizations are faced with the challenge of realigning the project duration within the pre-determined time. Schedule delays often lead to 3-5% rise in project cost....
master thesis 2020
document
Hersbach, H.J.L. (author)
Many projects executed within organizations fail due to budget and time overruns. The goals for time and budget are often related to the planning of a project. However, due to unforeseen factors the execution often deviates from the initial project planning. These unforeseen factors can be led back to the extent to which a project is susceptible...
master thesis 2013
document
Shrikhande, Kshiteej (author)
In the current era of cut-throat competition, companies carry out projects to support its business. However, studies show that these projects fail to provide the expected results. This is due to the fast-changing environment where the project is set-in. The planning of the projects is influenced by the presence of these uncertainties and hence,...
master thesis 2017
document
Tegelberg, Joost (author)
Repetitive construction projects allow for planning to be done systematically, but performance is hard to predict due to inherent uncertainties. The goal of this research is to evaluate planning choices in repetitive construction projects. In order to evaluate the planning of these projects to quantify the risk of overruns, an adaptable...
master thesis 2019
document
Kroon, A.G. (author)
The Hydraulics division (WT) in The Hague, part of het Delta department, consists of 5 production-departments that execute the so-called "advising-proces" , i .e. they support the Deltaworks by supervising and carrying out technica1 studies. Today their planning and accounting system (PLAC) is mainly a partial and uniform time-accounting- system...
master thesis 1984
document
Boelens, Niels (author)
The goal of this research is to create a design for a method to enable the generation and implementation of evidence-based throughput times in the planning process of the construction industry. The current planning process and the generation and collection of throughput times relies heavily on experience-based information. Generating throughput...
master thesis 2022
document
Droutsas, Athanasios (author)
This report, which from now and onwards will be called the main body of the thesis, covers the core of the<br/>problem that has to be solved. Generally, the aim of this thesis is to investigate a laminated composite’s<br/>structural response, made of FRP, when its material properties are assumed stochastic instead of<br/>deterministic. The...
master thesis 2018
Searched for: subject%3A%22project%255C+planning%22
(1 - 9 of 9)