Searched for: subject:"upending"
(1 - 3 of 3)
document
van der Veen, Gerard (author)
To respond to the growing offshore industry Jumbo Maritime has designed a new vessel to expand its offshore fleet: The Stella Synergy. The vessel will be able to install monopiles for the offshore wind and oil and gas industry. The main objective of this thesis is: Making a model that is able to predict the motions of the vessel as well as the...
master thesis 2019
document
Jutten, Daan (author)
Offshore wind farms are moving to deeper waters, implying that larger substructures will need to be installed. The monopile is the leading substructure nowadays and this structure could be promising for use in deeper waters as well. Generally, jack-up vessels are used for the installation of the substructures and turbines. However, the jacking...
master thesis 2019
document
Crol, J.B. (author)
The subject of this report is the upending of a floating monopile for an offshore wind turbine foundation. This is an assignment of Van Oord Dredging and Marine Contractors BV. An analytical model has been developed to simulate the upending of a monopile in MapleTM, based on the general theoretical principles and the experience of Van Oord. An...
master thesis 2015