P

P.

info

Please Note

1 records found

Contributed

The Smit sawing wire system was used in the salvage operation of the Baltic Ace. The sawing wire was drilled underneath the wreck and connected to two barges on opposite sides. Winches were placed on the barges to make a controlled cut through the wreck by pulling the sawing wire ...