A

A.M.

info

Please Note

1 records found

Contributed

Embedding of subsea pipelines for protection purposes is usually done in a ‘Trench – Install – Backfill’ operation. The pipeline can also be embedded after it is installed on the seabed. This method is called post-trenching. When using a trailer suction hopper dredger for post-tr ...