The effect of empathy on the integrated design process of infrastructure projects through communication
Using serious gaming to simulate the communicative processes during the integrated design process
The purpose of this study was to understand the effect of empathy in the project team on the outcome of the integrated design process of infrastructure projects. Despite years of experience, many infrastructure projects are still underperforming. Within the project lifecycle, the
...
The Importance Of The Empathic Ability Of Project Participants During The Preconstruction Phase To Construction Project Performance
Designing A Framework To Improve Project Performance Via Empathy
The aim of this research was to investigate if and how the project performance of integrated construction projects can be improved by focussing on empathy during the preconstruction phase. Big infrastructural construction projects often face a poor project performance which cause
...
Many construction projects experience cost overruns (Flyvbjerg & Holm, 2002), which is the difference between the estimated cost and the final costs of a project. In Design & Build procured projects, the contractor is responsible for both designing and constructing the pr
...
The Interplay between the Contract Type and the Management of Cost Groups
Exploring the relationship between the contract type and the management of cost groups in Dutch national infrastructure projects
Construction projects are argued to be the most complex of all production undertakings (Baccarini, 1996). Williams (2002, 2005) states that the complexity of these projects is a contributing factor to project failures, such as cost overrun, which are commonly seen in infrastructu
...