Gumbs, Eljoenai (author)
In the last decade, the Bouwteam concept has become increasingly popular in the construction industry. A Bouwteam agreement is a bilateral agreement between a client and a main contractor, in which the main contractor is involved at an early stage. An advantage of a Bouwteam collaboration is that risks which occur in the construction phase are...
master thesis 2023
document
Ceylan, Altan (author)
Rijkswaterstaat has introduced the two-stage model in the Dutch construction industry in order to reduce risks in large and complex projects (Rijkswaterstaat, 2020a). However, it is also possible that the two-stage model can influence the sustainability of infrastructure projects since the risks are reduced and a different way of collaboration...
master thesis 2022
document
Kreike, Boris (author)
The number of raw materials consumed and waste generated by the construction industry is no longer a viable solution in the future. It is required for the construction industry to move from a linear towards a circular economy (CE) by circular construction (CC). The unfamiliarity in actions that need to be taken for CC is still new terrain for...
master thesis 2022
document
van der Pas, Eef (author)
Bouwteam is a Dutch project delivery method that involves the contractor and the client in a collaborative way in a construction project's design process. With this early involvement of the contractor, this project delivery method contains two agreements during the project. The first agreement is for the contractor's involvement in the design...
master thesis 2021
document
van de Hoef, Beppie (author)
The Bouwteam is in both the building and infrastructure sector increasingly mentioned as a possibility to improve client-contractor collaboration. Currently, compared to the building sector, the infrastructure sector lags behind in applying this collaboration format. This research aims to investigate to what level building and infrastructure...
master thesis 2020
document
de Hoog, Jolanda (author)
Recently, the Marktvisie (2016) expressed the need for more collaborative relationships based on equality and lately, a shift from adversarial to collaborative relationships is observed. The use of collaborative contracting strategies is increasing of which the bouwteam is an example. The bouwteam is a collaboration agreement during the design...
master thesis 2020
document
Nader, Alend (author)
In the past decade the relationship between the client and contractor in the Dutch infrastructure sector has been disrupted. This disrupted relationship can mainly be characterised as adversarial and distrusting. Additionally, this has resulted in a growing number of disputes between the client and the contractor. As a result of the adversarial...
master thesis 2019
document
van Riggelen, Roos (author)
Bouwteam is a collaboration agreement in which the contracor is involved early on to work together with the client to make a design in which the knowledge of the client and the contractor is used optimally. Through the years the Bouwteam has been influenced by integrated contracts and has been changing in a variety of ways. Nowadays, there is...
master thesis 2019
document
Engelhart, Eric (author)
“Who of us would not be happy to lift the veil behind which the future is hidden and to focus our thoughts on the unknown future” (Shepherd & Williams, 2015). What if we already know our unknowns, would it not be a piece of cake to deliver construction projects of high quality within time and budget? In order to predict the unknown future,...
master thesis 2018
document
van Wijck, Dirk (author)
Public construction projects have an image of poor performance, both in the Netherlands and other countries. Too many public projects go over budget and over time. A possible improvement to this poor performance could be Early Contractor Involvement (ECI). ECI literally translates to involving a contractor “early”, which in current practice...