Searched for: author%3A%22Dassanayake%2C+D.%22
(1 - 2 of 2)
document
Raby, A. C. (author), Antonini, A. (author), Pappas, A. (author), Dassanayake, D. T. (author), Brownjohn, J. M.W. (author), D'Ayala, D. (author)
Lighthouses situated on exposed rocky outcrops warn mariners of the dangers that lurk beneath the waves. They were first constructed when approaches to wave loading and structural response were relatively unsophisticated, essentially learning from previous failures. Here, we chart the evolution of lighthouses on the Wolf Rock, situated...
journal article 2019
document
Aibinu, A.A. (author), Dassanayake, D. (author), Thien, V.C. (author)
Pre-tender estimates are susceptible to inaccuracies (biases) because they are often prepared within a limited timeframe, and with limited information about project scope. Inaccurate estimation of project uncertainties is the underlying cause of project cost overruns in construction. Typically, cost engineers and quantity surveyors would add...
conference paper 2011