Searched for: contributor%3A%22Keetels%252C%255C+G.H.%255C+%255C%2528mentor%255C%2529%22
(1 - 1 of 1)
- document
-
Brouwers, R.J.P. (author)This version of the thesis only covers the non-confidential part of the report. Tideway, as an offshore contractor, is often involved during the construction of an offshore wind farm to carry out cable burial and/or rock placement operations. The process of burying a cable, by means of a trencher, is until now executed by subcontractors. Tideway...master thesis 2013