- document
-
Beutick, Erik (author)A time-dependent capacity increase has often been observed for driven displacement piles in sand. Long-term bearing capacity increase after dissipation of excess pore water pressure is referred to as set-up. Significant increases in axial capacity have been reported where the rate of set-up varied between 15 and 75% per log cycle of time. <br/>...master thesis 2017