Brouwers, R.J.P. (author)
This version of the thesis only covers the non-confidential part of the report. Tideway, as an offshore contractor, is often involved during the construction of an offshore wind farm to carry out cable burial and/or rock placement operations. The process of burying a cable, by means of a trencher, is until now executed by subcontractors. Tideway...
master thesis 2013
document
Siteur, W.J. (author)
Embedding of subsea pipelines for protection purposes is usually done in a ‘Trench – Install – Backfill’ operation. The pipeline can also be embedded after it is installed on the seabed. This method is called post-trenching. When using a trailer suction hopper dredger for post-trenching, a large water jet erodes the soil underneath the pipe...
master thesis 2012
document
Van de Leur, K. (author)
It is common practice to protect subsea pipelines by embedding them into the soil. Trenches can be made before or after the pipelines have been laid. In the latter case, the excavation process is called post-trenching. The essence of post-trenching, as handled in this thesis, is erosion of sand by a water-jet. The literature study focused on the...
master thesis 2010