Searched for: year%3A2001+department%3A%22hydraulic%22
(1 - 1 of 1)
document
Ummenthun, R.J.M.C. (author)
At the rear of a tunnel-boring machine (TBM), the tail void - the annular space between the concrete lining and soil - is injected with grout. This grout has a number of functions, the most important being settlement control, maintaining the primary stress in the ground and fixation of the segmented concrete lining. At the Green Heart tunnel in...
master thesis 2001