Searched for: year%3A2017+department%3A%22hydraulic%22
(1 - 1 of 1)
document
Westland, C.N. (author)
220 miles offshore the West-Australian coast lies the Ichthys Field. In 2013 Heerema Marine Contractors (HMC) was contracted to install the umbilicals, risers and flowlines for the Ichthys Project, including the installation of several in-line structures such as in-line tees (ILT) and flow-line end terminations (FLET). The ship assigned to these...
master thesis 2017