Print Email Facebook Twitter Bay of Fundy: Tidal powr project Title Bay of Fundy: Tidal powr project Author Tavenier, M. Contributor Agema, J.F. (mentor) Glerum, A. (mentor) Vos, C.J. (mentor) Stuip, J. (mentor) Verspuy, C. (mentor) Küppers, J.A.G. (mentor) Faculty Civil Engineering and Geosciences Department Hydraulic Engineering Date 1985-09-01 Abstract In the first fase of this study, attention is paid to the cross section of the dam for a plant in Cumberland Basin, capacity 1085 MW. Chosen is for generation over the ebb with use of bulb turbines. The main subject of this study was the design of the turbine caisson. The main subjects are Design principles, Dimensions, Loading and Foundation. The subvolume is about the enormous tidal difference (in dutch). Subject getijverschillenwaterstandenBay of Fundyhydropowerturbinepowerplant To reference this document use: http://resolver.tudelft.nl/uuid:0783f308-1641-42ee-a237-284eb83dd5cd Part of collection Student theses Document type master thesis Rights (c) 1985 Tavenier, M. Files PDF Tavenier1985a.pdf 28.1 MB PDF Tavenier1985b.pdf 12.59 MB Close viewer /islandora/object/uuid:0783f308-1641-42ee-a237-284eb83dd5cd/datastream/OBJ1/view