Sizing of toe berm armor stone on rubble-mound breakwater and jetty trunks designed for depth-limited breaking waves
More Info
expand_more
expand_more
Abstract
This technical note is to provide design guidance for sizing toe berm armor stone on breakwater and jetty trunks exposed to depth limited breaking waves whose crests approach at or near parallel to the structure.
Files
TPG1101701.pdf
(pdf | 0.454 Mb)