Searched for: subject%3A%22improvement%22
(1 - 2 of 2)
document
Bruijn, Willem (author)
A complex marine project consist of series of operations, with each operation subject to a predefined operational limit and duration, depending on the equipment being used. If actual weather conditions exceed the operational limit, then the operation cannot be executed and hence downtime occurs. It is up to contractors, such as Boskalis, to...
master thesis 2017
document
Van Rijssel, R.E. (author)
In this thesis a framework is built to find flow improvement measures to lower the turnaround time for aircraft component MRO processes. This framework is tested in a case study at KLM E&M. The main research question that is answered in this research is: What flow improvement measures can be used to lower the turnaround time of components in...
master thesis 2016