Estimates are that circa 40GW of offshore wind power capacity is going to be installed throughout Europe by the end of this decade. In this scenario, a pan-European offshore grid network is needed in order to efficiently integrate large amounts of offshore wind into the different ...
EeFarm-II is used to evaluate 13 different electrical systems for a 200 MW wind farm with a 100 km connection to shore. The evaluation is based on component manufacturer data of 2009. AC systems are compared to systems with DC connections inside the wind farm and DC connection to ...
Doubly fed induction generator (DFIG) still shares a large part in today's wind power market. It provides the benefits of variable speed operation cost-effectively, and can control its active and reactive power independently. Crowbar protection is often adopted to protect the rot ...
Today, doubly fed induction generator (DFIG) gains the dominant market power in the wind energy industry. It provides the benefits of variable speed operation cost-effectively, and can control its active and reactive power independently. Crowbar protection is often adopted to pro ...
The increasing penetration of variable speed wind turbines in the electricity grid will result in a reduction of the number of connected conventional power plants. This will lead to a reduction of inertia in the grid, as the rotational speed of a variable speed turbine and the gr ...
The large offshore wind farms are planed to be connected with power grid at transmission level due to their large power capacity and possible long transmission distances. HVDC thyristor bridge as well as other integration methods requires systematical integration studies. In this ...