MP
Miguel Picallo
info
Please Note
<p>This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.</p>
2 records found
1
The lack of measurements in distribution grids poses a severe challenge for their monitoring: Since there may not be enough sensors to achieve numerical observability, so load forecasts (pseudo-measurements) are typically used, and thus an accurate state estimation is not guarant
...
The small amount of measurements in distribution grids makes their monitoring difficult. Topological observability may not be possible, and thus, pseudo-measurements are needed to perform state estimation, which is required to control elements such as distributed generation or tr
...