MT
M. Thewes
info
Please Note
<p>This page displays the records of the person named above and is not linked to a unique person identifier. This record may need to be merged to a profile.</p>
2 records found
1
Designing the main drive motor capacity of Earth Pressure Balanced Tunnel Boring Machines (EPB TBMs) is a crucial task for every EPB tunnelling project. The machine needs to be equipped with sufficient power to master the geotechnical conditions of the respective project. On the
...
A significant part of the energy consumed during the tunnelling process of Earth Pressure Balanced (EPB) Tunnel Boring Machines (TBMs) is related to the main drive, consisting of a set of motors driving the rotation of the cutting wheel. An energy efficient EPB design requires th
...