-
document
-
Minchin, E. (author), Li, X.X. (author)
The traditional system of design-bid-build has long been the principal delivery system for horizontal construction; it has been employed by all the transportation departments in the United States for almost a century. The shift toward design-build (DB) as a time saving method has been successful in many ways, but use of the system has exposed...
conference paper 2011
Source URL (retrieved on 2024-05-24 07:00): https://repository.tudelft.nl/islandora/search/%20?amp%3Bamp%3Bf%5B0%5D=mods_genre_s%3A%22book%22&%3Bamp%3Bsort=mods_originInfo_dateSort_dt%20asc&%3Bf%5B0%5D=mods_name_personal_author_namePart_family_ss%3A%22Huang%22&collection=research&f%5B0%5D=mods_subject_topic_ss%3A%22construction%22&f%5B1%5D=mods_subject_topic_ss%3A%22delivery%22&f%5B2%5D=mods_genre_s%3A%22conference%5C%20paper%22