-
document
-
van Dalen, J.H. (author), Servais, R. (author), Boone, D.C. (author)
The A2 tunnel in Maastricht has been built within a dry building pit with a maximum depth of 22 meters with sheet pile walls, suspended in a cement bentonite trench supported by struts at 2 to 4 levels. Dewatering is done by deepwells. The excavation reaches into Limestone layers so the maximum mobilized passive resistance of the sheet pile wall...
conference paper 2015
Source URL (retrieved on 2024-06-18 09:54): https://repository.tudelft.nl/islandora/search/%20?amp%3Bamp%3Bf%5B0%5D=mods_name_personal_author_namePart_family_ss%3A%22Doorn%22&%3Bamp%3Bf%5B1%5D=mods_subject_topic_ss%3A%22measurement%22&%3Bamp%3Bf%5B2%5D=mods_subject_topic_ss%3A%22hydraulics%22&%3Bamp%3Bf%5B3%5D=mods_subject_topic_ss%3A%22hydraulica%22&%3Bf%5B0%5D=mods_name_personal_author_namePart_family_ss%3A%22Dekker%22&collection=research&f%5B0%5D=mods_subject_topic_ss%3A%22monitoring%22&f%5B1%5D=mods_name_personal_author_namePart_family_ss%3A%22Boone%22