-
document
-
van Dalen, J.H. (author), Servais, R. (author), Boone, D.C. (author)
The A2 tunnel in Maastricht has been built within a dry building pit with a maximum depth of 22 meters with sheet pile walls, suspended in a cement bentonite trench supported by struts at 2 to 4 levels. Dewatering is done by deepwells. The excavation reaches into Limestone layers so the maximum mobilized passive resistance of the sheet pile wall...
conference paper 2015
Source URL (retrieved on 2024-05-28 21:23): https://repository.tudelft.nl/islandora/search/%2520?display=tud_default&f%255B0%255D=mods_name_personal_author_namePart_family_ss%253A%2522Van%255C%2520Nieuwenhuijzen%2522&f%255B1%255D=mods_name_personal_author_namePart_family_ss%253A%2522De%255C%2520Jonge%2522&f%255B2%255D=mods_name_personal_author_namePart_family_ss%253A%2522De%255C%2520Niet%2522&f%255B3%255D=mods_name_personal_author_namePart_family_ss%253A%2522Langeveld%2522&f%5B0%5D=mods_subject_topic_ss%3A%22monitoring%22&f%5B1%5D=mods_name_personal_author_namePart_family_ss%3A%22Boone%22