The Fifth Plateau

Defining the threshold for a Third Industrial Revolution in Luxembourg Ville

Master Thesis (2017)
Author(s)

J. Aarts (TU Delft - Architecture and the Built Environment)

Contributor(s)

F. Geerts – Mentor

A.S. Alkan – Mentor

Faculty
Architecture and the Built Environment
Copyright
© 2017 Jochen Aarts
More Info
expand_more
Publication Year
2017
Language
English
Copyright
© 2017 Jochen Aarts
Coordinates
49.60532, 6.14713
Graduation Date
06-07-2017
Awarding Institution
Delft University of Technology
Faculty
Architecture and the Built Environment
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

Luxembourg can be read as a system of plateaus interconnected by large pieces of infrastructure that physically connect them. The edges of the plateaus fullflil a communicating function together with the urban ensembles that occupy the platform. The development of these separate islands has always gone hand in hand with a specific economic ambition and has been instigated by firstly building a bridge (piece of infrastructure) to the new deserted plateau. In this respect we could classify the various plateaus as follows: Ville Haute plateau war economy and fortifications; Garer plateau, second industrial revolution and steel industry; Cents plateau, suburban lifestyle; Kirchberg plateau, service economy and the European Parliament. Within this system of intertwining plateaus there is one plateau that seems underdeveloped in relation to its potential within the current ambitions of Luxembourg to focus on the third industrial revolution. This plateau I call the fifth plateau.

The “Fifth Plateau” project imagines a new way to catalyse the urbanization of that empty plateau in Luxembourg Ville. It does so by proposing an architecture of an infrastructural scale on the edge of the plateau. By doing so the project, firstly participates in the system of communication of between the various plateaus, secondly provides a programmatic fuel injection to instigate future development. The project is proposed as a 500m long structure that sits on that edge facing the rest of the city. The structure allows for various sections to be hanged from it in accordance to the specific topographic condition. The horizontal surface on top of the Vierendeel trusses functions as a public promenade along the edge and is the address to the various programs below. The program is based on various aspects related to a third industrial revolution and is located in accordance to the opportunities the topography gives. Therefore the data centre is located where the structure enters the ground, where the project bridges a small valley the structure houses the restaurant, convention centre and hotel. The concave slope houses the robotics labs, where the concave slope facilitates the IT laboratories. Finally the soft, almost horizontal slope, closest to the Garer plateau will facilitate maker spaces for public use. The facade is a literal curtain wall that follows the movement of the topography and reflects the various longitudinal sections that facilitate the variety of programmatic elements.

The project is a contemporary approach towards the edge condition in Luxembourg by performing as a light weight, flexible structure that moves with and accentuates the topographical condition of the fifth plateau. It proposes an architecture that addresses the newest economic ambition of Luxembourg, namely The Third Industrial Revolution. It sets out to function as the threshold for the further development of the Fifth plateau so that it can play its role as a new chapter within the history of the development of the plateaus in Luxembourg Ville.

Files

License info not available
Site_1_1000_combined.jpg
(jpg | 13.6 Mb)
License info not available
Elevation_part.png
(png | 38.4 Mb)
License info not available
Isometric.jpg
(jpg | 18.5 Mb)
License info not available
Exploded_view.jpg
(jpg | 12.4 Mb)
License info not available
Night_Scene.png
(png | 7.46 Mb)
License info not available
Surface.png
(png | 6.68 Mb)
License info not available
RebderCave.pdf
(pdf | 2.49 Mb)
License info not available
Servers.png
(png | 14 Mb)
License info not available
Robotics_Hall.png
(png | 35.1 Mb)
License info not available
License info not available
01_Survey_topography.jpg
(jpg | 7.78 Mb)
License info not available
License info not available
02_System_Program.jpg
(jpg | 12.3 Mb)
License info not available
License info not available
04_Site_plan.jpg
(jpg | 12 Mb)
License info not available
05_Part.jpg
(jpg | 1.94 Mb)
License info not available
06_Project_urbanized.jpg
(jpg | 7.63 Mb)
License info not available
License info not available
Structure1.500.jpg
(jpg | 2.65 Mb)
License info not available
Plans_1_500.jpg
(jpg | 12.7 Mb)
License info not available
Data_center.jpg
(jpg | 12.6 Mb)
License info not available
Hotel_and_robot.jpg
(jpg | 9.46 Mb)
License info not available
Cliff_maker_space.jpg
(jpg | 8.72 Mb)
License info not available
Detail120_final.jpg
(jpg | 8.7 Mb)
License info not available