BIMplimentation, BIMtergration
A research to the implementation and integration of BIM as a building process for existing buildings.
P.J. van Berkel (TU Delft - Architecture and the Built Environment)
B. Baehre – Mentor
Frank Schnater – Graduation committee member
Emiel Reniers – Coach
More Info
expand_more
Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.
Abstract
How is BIM implemented and integrated as a building process for existing
buildings on a social and organizational level? By researching the building process at Schiphol during the project upgrade Wortel g-pier and combining these results with theoretical knowledge of BIM, a hypothesis could be written with a potential method of implementing and integrating BIM. This hypothesis could then be implemented and tested for the project upgrade Wortel g-pier at Schiphol Airport. The results of the implementation of the hypothesis could then be generalized to all projects where there would be an existing building.