BIMplimentation, BIMtergration

A research to the implementation and integration of BIM as a building process for existing buildings.

Master Thesis (2018)
Author(s)

P.J. van Berkel (TU Delft - Architecture and the Built Environment)

Contributor(s)

B. Baehre – Mentor

Frank Schnater – Graduation committee member

Emiel Reniers – Coach

Faculty
Architecture and the Built Environment
Copyright
© 2018 Paul van Berkel
More Info
expand_more
Publication Year
2018
Language
English
Copyright
© 2018 Paul van Berkel
Graduation Date
27-10-2018
Awarding Institution
Delft University of Technology
Project
['Upgrade Wortel g-pier']
Faculty
Architecture and the Built Environment
Reuse Rights

Other than for strictly personal use, it is not permitted to download, forward or distribute the text or part of it, without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license such as Creative Commons.

Abstract

How is BIM implemented and integrated as a building process for existing
buildings on a social and organizational level? By researching the building process at Schiphol during the project upgrade Wortel g-pier and combining these results with theoretical knowledge of BIM, a hypothesis could be written with a potential method of implementing and integrating BIM. This hypothesis could then be implemented and tested for the project upgrade Wortel g-pier at Schiphol Airport. The results of the implementation of the hypothesis could then be generalized to all projects where there would be an existing building.

Files

License info not available
License info not available